HVAC Design: Level I – Essentials provides intensive, practical training ideal for recent technical or engineering school graduates, engineers new to the HVAC field, those who need a refresher in new technologies, and facility managers, sales representatives and others who want to gain a better understanding of HVAC fundamentals, equipment and systems.
Day 1
12:30 Introductions
12:35 Fundamentals
1:35 Load Calculation
2:20 Break
2:30 Load Calculation (cont.)
3:50 Codes and Standards
4:30 Adjourn
_____________________________________________________________
Day 2
12:30 Psychrometrics
2:40 Break
2:50 System Selection
3:50 Commissioning and Standard 180
4:30 Adjourn
_____________________________________________________________
Day 3
12:30 Design Process
1:30 Basic Design of Air Systems
2:30 Break
2:40 Basic Design of Air Systems (cont.)
4:30 Adjourn
_____________________________________________________________
Day 4
12:30 Basic Design of Hydronic Systems
2:00 Break
2:10 HVAC Equipment
4:30 Adjourn
_____________________________________________________________
Day 5
12:30 HVAC Systems
2:30 Break
2:40 HVAC Systems (cont.)
3:20 BAS Controls
4:30 Adjourn
HVAC Design Level II – Applications provides instruction in HVAC system design for experienced HVAC engineers and those who have completed the HVAC Design: Level I – Essentials. The training covers the technical aspects of design and allows participants an opportunity to expand their exposure to HVAC systems applications to increase energy savings and improve indoor environmental quality.
Day 1
12:30 Introductions
12:35 Sustainability/Green/LEED/HPB/NZEB
1:50 Standard 55
2:40 Break
2:50 Standard 62.1
4:05 Building Systems: Example 1 Education Facility
4:30 Adjourn
Day 2
12:30 Building Systems: Example 1 Education Facility (cont.)
2:30 Break
2:40 Building Systems: Example 1 Education Facility (cont.)
4:30 Adjourn
Day 3
12:30 Building Systems: Example 1 Education Facility (cont.)
1:15 Building Systems: Example 2 Multi-Story Office Building
2:30 Break
2:40 Building Systems: Example 2 Multi-Story Office Building (cont.)
3:25 Building Systems: Example 3 Multi-Story Office Building
4:30 Adjourn